Site icon Jimerson Birr

Prepared and Negotiated Documents for International Developer’s Construction of $40 Million Project Domestically

Represented an international real estate developer with the preparation and negotiation of all contract documents in connection with the construction of a $40 million observation deck and lobby renovation at the tallest office tower west of the Mississippi River, which included a unique thrill feature involving an exterior glass slide between the 70th and 69th floors.

Exit mobile version